‹ Reports
The Dispatch

OSS Report: teableio/teable


Teable Faces Critical Deployment Challenges Amidst Feature Expansion

Teable, a no-code database solution built on PostgreSQL, is grappling with critical deployment issues while expanding its feature set to enhance user experience.

Recent Activity

Recent issues such as Docker images crashing (#931) and image preview errors (#929) highlight significant deployment challenges. These, along with backend storage configuration problems (#927), suggest ongoing integration difficulties. Concurrently, the team is addressing user demands for enhanced views and integration capabilities, as seen in requests for calendar view (#897) and OIDC login support (#434).

Development Team and Recent Activity

Of Note

  1. Internationalization Push: Significant efforts in adding language support signal a focus on global accessibility.

  2. Feature Enhancements: Introduction of functionalities like duplicate row and gallery view enhance user interaction.

  3. Deployment Issues: Critical bugs related to Docker images and backend storage highlight deployment challenges.

  4. User Experience Focus: Continuous UI/UX improvements reflect an emphasis on enhancing user satisfaction.

  5. Collaboration and Maintenance: Efficient handling of PRs suggests strong project management and collaboration.

Quantified Reports

Quantify Issues



Recent GitHub Issues Activity

Timespan Opened Closed Comments Labeled Milestones
7 Days 6 5 14 5 1
30 Days 22 17 40 15 1
90 Days 66 45 96 51 1
All Time 145 86 - - -

Like all software activity quantification, these numbers are imperfect but sometimes useful. Comments, Labels, and Milestones refer to those issues opened in the timespan in question.

Quantify commits



Quantified Commit Activity Over 30 Days

Developer Avatar Branches PRs Commits Files Changes
Boris 1 10/10/0 10 273 13686
Bieber 2 25/25/1 69 233 12072
Mike 1 5/6/0 6 168 8735
SkyHuang 1 6/6/0 6 153 6097
Kirill 1 2/1/1 1 14 1863
tkymmm 1 1/1/0 1 15 1756
zholadev 1 1/1/0 1 3 227
AliceLanniste 1 3/1/1 1 2 4
Kaiwalya Koparkar 1 0/1/0 1 1 2
None (eastonLua) 0 1/0/0 0 0 0
Suryansh Anand (spiritanand) 0 0/0/1 0 0 0

PRs: created by that dev and opened/merged/closed-unmerged during the period

Detailed Reports

Report On: Fetch issues



GitHub Issues Analysis

Recent Activity Analysis

Recent activity in the Teable project shows a focus on resolving critical bugs and enhancing user experience with new features. Notable issues include problems with Docker images crashing (#931), image preview errors (#929), and backend storage configuration issues (#927). These indicate ongoing challenges with deployment and integration, which are crucial for user adoption and satisfaction.

Anomalies include the recurring theme of issues related to image handling and previews, as seen in #931, #929, and #885. This suggests a potential underlying problem with how images are processed or displayed. Additionally, several issues highlight difficulties with importing data, such as CSV import errors (#877) and Excel import mapping (#588), pointing to a need for more robust data import functionality.

Common themes include requests for enhanced views (e.g., calendar view #897, hierarchy view #876) and feature requests for better integration capabilities (e.g., OIDC login #434, automation platform support #622). These reflect user demand for more diverse functionality and seamless integration with existing systems.

Issue Details

Most Recently Created Issues

  • #931: Latest images crashing

    • Priority: High
    • Status: Open
    • Created: 2 days ago
    • Updated: 1 day ago
  • #929: Image preview - 400 Bad Request

    • Priority: High
    • Status: Open
    • Created: 2 days ago
  • #927: BACKEND_STORAGE_PROVIDER= s3 error

    • Priority: Medium
    • Status: Open
    • Created: 3 days ago
    • Updated: 2 days ago

Most Recently Updated Issues

  • #835: Table comments

    • Priority: Medium
    • Status: Closed
    • Created: 37 days ago
    • Updated: 2 days ago
  • #834: Cell comments

    • Priority: Medium
    • Status: Closed
    • Created: 37 days ago
    • Updated: 2 days ago
  • #833: Comments field type

    • Priority: Medium
    • Status: Closed
    • Created: 37 days ago
    • Updated: 2 days ago

These issues highlight ongoing efforts to enhance user interaction through improved commenting features while addressing critical technical challenges related to deployment and data handling.

Report On: Fetch pull requests



Overview

The analysis of the pull requests (PRs) for the Teable project reveals a dynamic and active development environment. The PRs cover a wide range of updates, including feature additions, bug fixes, and enhancements across various components of the project. Notably, there is a strong focus on improving user experience, expanding functionality, and ensuring robust performance.

Summary of Pull Requests

Open Pull Requests

  • PR #932: Fixes issues with upload URL and preview image on localhost. It includes several commits addressing bugs related to image preview after upload.
  • PR #930: Implements duplicate row functionality, enhancing data manipulation capabilities within the application.
  • PR #786: New Crowdin updates for localization, indicating ongoing efforts to support multiple languages.
  • PR #869: Adds gallery view functionality, expanding the visual representation options for users.
  • PR #812: A minor fix in field-converting.service.ts, showing attention to detail in code quality.

Closed Pull Requests

  • PR #933: Merged recently, it adds default values for various field types, streamlining data entry processes.
  • PR #928 & PR #926: Both add Russian language support, reflecting the project's commitment to internationalization.
  • PR #869: Adds gallery view as a default option, enhancing user interface flexibility.
  • PR #812: A minor update that was merged quickly, indicating efficient handling of small but important changes.

Analysis of Pull Requests

The PRs indicate a well-organized development process with clear categorization of tasks. The presence of both feature additions and bug fixes suggests a balanced approach towards enhancing functionality while maintaining stability.

Themes and Commonalities

  1. Internationalization and Localization: The repeated updates for adding language support (e.g., Russian) highlight an ongoing effort to make Teable accessible to a broader audience. This is crucial for a no-code platform aiming for global reach.

  2. User Experience Enhancements: Features like duplicate row functionality and gallery view addition point towards a strong focus on improving user interaction with the platform. These enhancements are vital for retaining users and attracting new ones by making the platform more intuitive and versatile.

  3. Continuous Improvement and Maintenance: The quick turnaround on minor fixes (e.g., PR #812) demonstrates an active maintenance effort. This is essential for any software project to ensure reliability and user satisfaction.

  4. Localization Efforts: The Crowdin updates (e.g., PR #786) suggest that Teable is actively working on localizing its content, which is important for user adoption in non-English speaking regions.

Notable Observations

  • The development team seems responsive to both feature requests and bug reports, as evidenced by the timely merging of PRs addressing these areas.
  • There is a clear structure in how PRs are categorized and handled, which is indicative of good project management practices.
  • The inclusion of tests (e.g., e2e tests in PR #812) alongside feature additions shows a commitment to maintaining code quality and preventing regressions.

Potential Areas for Improvement

  1. Documentation Updates: As new features are added (e.g., gallery view), ensuring that documentation is updated accordingly will help users make the most out of new functionalities.

  2. Performance Monitoring: With continuous additions of features like duplicate rows and gallery views, monitoring performance impacts will be crucial to maintain the application's responsiveness.

  3. Community Engagement: Given the project's open-source nature, engaging more with the community through discussions on proposed features or changes could provide valuable insights and foster a collaborative environment.

In conclusion, Teable's development efforts as reflected in the PRs show a robust process aimed at enhancing functionality, improving user experience, and expanding its global reach through localization. The team's responsiveness to both new features and maintenance tasks bodes well for the project's future growth and stability.

Report On: Fetch commits



Development Team and Recent Activity

Team Members and Activities

  • Bieber (tea-artist)

    • Recent work includes documentation updates, feature enhancements for default values, and translation updates across multiple languages.
    • Collaborated on various branches, focusing on internationalization and backend improvements.
    • Active in both the develop and l10n_develop2 branches.
  • Mike (caoxing9)

    • Worked on supporting record comments, fixing dashboard issues, and optimizing grid view performance.
    • Engaged in backend development and testing enhancements.
  • Boris (boris-w)

    • Focused on dashboard features, plugin settings, and UI adjustments.
    • Contributed to enhancing query builders and fixing UI-related bugs.
  • Kirill (zycck)

    • Added Russian language support.
    • Involved in internationalization efforts.
  • AliceLanniste

    • Made UI style adjustments for the "Add new record" feature.
  • SkyHuang (Sky-FE)

    • Addressed grid view performance issues and implemented record history functionality.
    • Worked on fixing permission-related bugs.
  • Kaiwalya Koparkar (kaiwalyakoparkar)

    • Added a one-click deploy option for Elestio.
  • Zholadev

    • Developed drag-and-drop functionality for attachments.
  • Tkymmm

    • Contributed Japanese translations.

Patterns, Themes, and Conclusions

  • Internationalization: Significant focus on adding and updating translations for multiple languages, indicating a push towards global accessibility.

  • Feature Enhancements: Continuous improvement of existing features like dashboards, plugins, and grid views. Introduction of new functionalities such as record comments and drag-and-drop attachments.

  • Collaboration: Team members frequently collaborate across branches to integrate features and fix bugs, reflecting a cohesive development process.

  • Performance Optimization: Efforts to optimize performance in areas like grid view rendering and query handling are evident.

  • UI/UX Improvements: Regular updates to UI components suggest an emphasis on enhancing user experience.

Overall, the team is actively engaged in expanding Teable's capabilities while ensuring a smooth user experience through performance optimizations and internationalization efforts.